Front Page

Road work, tree trimming scheduled next week in Solebury, Upper Makefield, Buckingham

Several area roads will be restricted next week for tree trimming operations, road resurfacing, and pothole repair.

Route 32 (River Road) between Cuttalossa Road and Greenhill Road in Solebury Township will be restricted from 9 a.m. to 3 p.m. on Monday, March 25, through Friday, March 29 for tree trimming operations.

Also, weekday lane restrictions with flagging are scheduled on several state highways beginning Monday, March 25, through Friday, April 19, from 9 a.m. to 3 p.m. for milling and paving on:

  • Pineville Road between Route 413 (Durham Road) and Ridge Road in Buckingham Township;
  • Ridge Road between Pineville Road and Street Road in Buckingham Township;
  • Street Road between Ridge Road and Lurgan Road in Buckingham and Upper Makefield townships; and
  • Lurgan Road between Street Road and Van Sant Road in Upper Makfield Township.

And PennDOT maintenance and contractor crews will be working to repair potholes and deteriorated pavement on:

  • Aquetong Road in Solebury Township;
  • Wrightstown Road in Upper Makefield Township;
  • Taylorsville Road in Upper Makefield Township; and
  • Route 532 (Washington Crossing Rd) in Upper Makefield Township.

Crews will restrict travel lanes on these state highways to patch areas of deteriorating pavement, so expect intermittent lane closures and possible slowdowns when driving near work crews. All activities are weather dependent.

 

About the author

Staff

Leave a Comment